503-826-1616
Project Cost:
$110,000
Project Duration:
Five Weeks
New construction of Oregon Department of Transportation entry and exit ramp off of high way 99E at MLK & Grand
Traffic control on a major high way
Saw cut and excavation on major inlets and manhole’s including Portland’s main water line inlet
Major and Minor adjustments
Structural rebar
einforcement
Level 3 dense MHMAC overlay
Pavement line removal and new striping including bicycle lanes and intersection
Break away pipes and new speed limit signs
Project Cost:
$340,000
Project Duration:
Nine Weeks
13,733 square foot tenant improvement including new office and laboratory space
Complete office demolition of walls, flooring and break room
Integrated storm water drainage system built into the warehouse slab
Epoxy floors
LED lights
12 new offices complete with new T-bar and tiles
New fixtures
Exterior SDC connections, chain link fencing and exterior concrete wall cuts for new windows
27,500 square feet
New interior walls
Plumbing and light fixtures
Finish Flooring
Doors
Counters
HVAC
Project Cost:
$45,000
Project Duration:
Four Days
1200 square foot bus pad in NE Columbia highway
Complete cut and removal of existing asphalt roadway
Excavation down under soils from 16 inches to 18 inches
Crushed bed rock compacted, and tested
Maintained ODOT highway traffic control measures.
Rebar placement and engineered grid patterns to limit erosion
Engineered dowel baskets and integrated saw cut control joints
Rapid set concrete at 5000 psi within 24 hours
Thermal blankets and heat control measures to cure within 24 hours
Round the clock job site security measures and traffic control
Concrete sealed for erosion control measurements
Loop sealed control joints
Project Duration:
Seven Weeks
Two brand new Guitarfish retail locations approximately 3400 square feet
Brand new electrical service
Brand new HVAC service with muffler exhaust system for sound deadening
Up to 8 lesson rooms with sound deadening wall fixtures
High temp insulated sound deadening glass doors
New segregated drum rooms with air baffles framed in between studs
LED light package
New fixtures
34,400 square feet
Selective demolition of existing interior walls, plumbing, light fixtures, doors
New interior walls
New Plumbing and light fixtures
Finish Flooring
Doors
Project Cost:
$35,000 per pad
Project Duration:
Two Weeks
1000 square foot bus pad on OR 99 E Highway
Complete cut and removal of existing asphalt roadway
Excavation down under soils from 16 inches to 18 inches
Crushed bed rock compacted, and tested
Maintained ODOT highway traffic control measures
Rebar placement and engineered grid patterns to limit erosion
Engineered dowel baskets and integrated saw cut control joints
Rapid set concrete at 5000 psi with controlled highway rake finish
Concrete sealed for erosion control measurements
Loop sealed control joints
Project Cost:
$279,000
Project Duration:
Eight Weeks
1,970 square foot fitness facility
A men’s and woman’s locker room complete with showers and restrooms.
Brand new HVAC system with stainless steel ductwork and make up air
Key card auto lock doors, electronic card pass system and security upgrades.
Full functioning gym complete with durable rubber athletic interlock floor
Project Cost:
$35,00 Per Pad
Project Duration:
Two Weeks
1000 square foot bus pad on OR 99 E Highway
Complete cut and removal of existing asphalt roadway
Excavation down under soils from 16 inches to 18 inches
Crushed bed rock compacted, and tested
Maintained ODOT highway traffic control measures
Rebar placement and engineered grid patterns to limit erosion
Engineered dowel baskets and integrated saw cut control joints
Rapid set concrete at 5000 psi with controlled highway rake finish
Concrete sealed for erosion control measurements
Loop sealed control joints
Project Cost:
$180,000
Project Duration:
Thirteen Weeks
600 square foot monolithic generator pad and brick enclosure
New Three phase, 500 KW, 60Hz, Standby Diesel Engine Generator
Sight surveys, saw cut and excavation
Re-grading, gravel compaction and sight tests
Formed cast monolithic curbs and concrete flatwork for generator
Sight excavation for new electrical transformer and interior electrical panels
Structural brick up to ten feet, wall caps
New sidewalks, curbs and parking space
1500 gallon fuel tanks, special inspections and Clackamas fire inspections and Building inspections
New landscaping, sprinkler system and trees
Concrete sealed for erosion control measurements
Round the clock job site security measures, light traffic control
Project Cost:
$313,000
Project Duration:
Eight Weeks
4,280 square foot complete tenant improvement to new location
Complete grid replacement, fire sprinkler system, HVAC and electrical panels
New fire sprinkler system
New integrated HVAC system tied into existing building
New electrical service panels
Full height glass office walls and flush floor conference phone systems
Project Cost:
$285,000
Project Duration:
Fourteen Weeks
20,000 square foot office/warehouse rehabilitation project
Accelerated Tri-Met construction schedule with tight deadlines and pin point inspection reports
New interior walls, restrooms and warehouse floor sealing
PGE approved transformer placement, New Castle pre-engineered concrete pad, and City mandated truck bollards
New 400 watt service panels
Interior finishes including new cabinets, carpet, tile, vinyl and paint
Wooden exterior stairs to an upper mezzanine
State of the art 2X2 LED light fixtures throughout mezzanine
Newly insulated mezzanine and exterior stucco upgrades
New landscaping, sprinkler systems and parking planter boxes
City mandated bicycle lockers
Project Cost:
$350,000
Project Duration:
Ten Weeks
3,950 square foot tenant improvement
Complete demolition including slab cut, grid removal and walls
Complete pressure wash and seal coated existing brick work to as new condition
Restored the classic building features to blend in with the Sellwood surround.
New interior finishes, custom rubber exercise floor lock system, tile restrooms
Complete Thermoplastic polyolefin (TPO) single-ply roofing membrane
Full height walls for sound deadening requirements
New HVAC system complete
Newly exposed ceiling with state of the art LED lighting throughout.
New parking lot striping and sealing
ADA improvements including new restrooms, sidewalks and ramps.
1,000 square feet complete turnkey tenant improvement
New patricians
New wallpaper in accordance to Cricket Wireless Corporate requirements
New carpet and paint
HVAC
Electrical
Plumbing
Exterior signage
Fire sprinkler alterations
Project consists of a vanilla shell tenant improvement in under a 28 day schedule!
2,200 square feet
Removal of a pony wall
Rerouting electrical and data for new cash register counter
Installation of new display case, sneeze guard, seasoning shelf
Interior lighting
VCT flooring workroom
Entryway tile
Cabinets
Paint including wall murals
25,000 square feet of combined office/showroom warehouse
Premier Italian ceramic flooring
Acoustical second look ceilings
New Bathrooms
Craftsman style architectural molding and trim work
Artistically stained concrete
Updated mechanical, electrical and plumbing
Windows
Demolition of original cedar