Being in the construction industry for over twenty years, we have been able to develop relationships with property management firms, architects, engineers and private clients. We have successfully built over one million square feet of combined office and warehouse space for various property owners within the Portland Metro area.

heavyconstructionv1

  • Oregon Department of Transporation (ODOT) Jughandle- OR 99E

    New construction of Oregon Department of Transportation entry and exit ramp off of high way 99E at MLK & Grand
    Traffic control on a major high way
    Saw cut and excavation on major inlets and manhole’s including Portland’s main water line inlet
    Major and Minor adjustments
    Structural rebar reinforcement
    Level 3 dense MHMAC overlay
    Pavement line removal and new striping including bicycle lanes and intersection
    Break away pipes and new speed limit signs
    Project Cost: $110,000
    Project duration: 5 weeks

    Oregon Department of Transporation (ODOT) Jughandle- OR 99E

    New construction of Oregon Department of Transportation entry and exit ramp off of high way 99E at MLK & Grand
    Traffic control on a major high way
    Saw cut and excavation on major inlets and manhole’s including Portland’s main water line inlet
    Major and Minor adjustments
    Structural rebar reinforcement
    Level 3 dense MHMAC overlay
    Pavement line removal and new striping including bicycle lanes and intersection
    Break away pipes and new speed limit signs
    Project Cost: $110,000
    Project duration: 5 weeks

  • Contech Stormwater Solutions

    13,733 square foot tenant improvement including new office and laboratory space
    Complete office demolition of walls, flooring and break room
    Integrated storm water drainage system built into the warehouse slab
    Epoxy floors
    LED lights
    12 new offices complete with new T-bar and tiles
    New fixtures
    Exterior SDC connections, chain link fencing and exterior concrete wall cuts for new windows
    Project Cost: $340,000
    Project duration: 9 weeks

    Contech Stormwater Solutions

    13,733 square foot tenant improvement including new office and laboratory space
    Complete office demolition of walls, flooring and break room
    Integrated storm water drainage system built into the warehouse slab
    Epoxy floors
    LED lights
    12 new offices complete with new T-bar and tiles
    New fixtures
    Exterior SDC connections, chain link fencing and exterior concrete wall cuts for new windows
    Project Cost: $340,000
    Project duration: 9 weeks030405060708091011121314151718

  • DOW Agrosciences

    27,500 square feet
    New interior walls

    Plumbing and light fixtures 
    Finish Flooring
    Doors
    Counters
    HVAC

    DOW Agrosciences

    27,500 square feet
    New interior walls

    Plumbing and light fixtures 
    Finish Flooring
    Doors
    Counters
    HVAC

  • Oregon Department of Transportation (ODOT) Bus Pad - NE Columbia Highway

    1200 square foot bus pad in NE Columbia highway
    Complete cut and removal of existing asphalt roadway
    Excavation down under soils from 16 inches to 18 inches

    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures.
    Rebar placement and engineered grid patterns to limit erosion
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi within 24 hours
    Thermal blankets and heat control measures to cure within 24 hours
    Round the clock job site security measures and traffic control
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $45,000
    Project duration: 4 days

    Oregon Department of Transportation (ODOT) Bus Pad - NE Columbia Highway

    1200 square foot bus pad in NE Columbia highway
    Complete cut and removal of existing asphalt roadway
    Excavation down under soils from 16 inches to 18 inches

    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures.
    Rebar placement and engineered grid patterns to limit erosion
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi within 24 hours
    Thermal blankets and heat control measures to cure within 24 hours
    Round the clock job site security measures and traffic control
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $45,000
    Project duration: 4 days

  • Guitarfish

    Two brand new Guitarfish retail locations approximately 3400 square feet
    Brand new electrical service

    Brand new HVAC service with muffler exhaust system for sound deadening

    Up to 8 lesson rooms with sound deadening wall fixtures

    High temp insulated sound deadening glass doors

    New segregated drum rooms with air baffles framed in between studs

    LED light package

    New fixtures

    Project duration: 7 weeks

     

    Guitarfish

    Two brand new Guitarfish retail locations approximately 3400 square feet
    Brand new electrical service

    Brand new HVAC service with muffler exhaust system for sound deadening

    Up to 8 lesson rooms with sound deadening wall fixtures

    High temp insulated sound deadening glass doors

    New segregated drum rooms with air baffles framed in between studs

    LED light package

    New fixtures

    Project duration: 7 weeks
    0102030405060708091011

    13151617

     

  • Immunology Laboratory

    34,400 square feet
    Selective demolition of existing interior walls, plumbing, light fixtures, doors 
    New interior walls 
    New Plumbing and light fixtures 
    Finish Flooring 
    Doors

    Immunology Laboratory

    34,400 square feet
    Selective demolition of existing interior walls, plumbing, light fixtures, doors 
    New interior walls 
    New Plumbing and light fixtures 
    Finish Flooring 
    Doors

  • Oregon Department of Transportation (ODOT) Bus Pad - OR 99E & Roethe Rd

    1000 square foot bus pad on OR 99 E Highway
    Complete cut and removal of existing asphalt roadway 

    Excavation down under soils from 16 inches to 18 inches 
    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures
    Rebar placement and engineered grid patterns to limit erosion 
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi with controlled highway rake finish
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $35,000 per pad
    Project duration: 2 weeks

    Oregon Department of Transportation (ODOT) Bus Pad - OR 99E & Roethe Rd

    1000 square foot bus pad on OR 99 E Highway
    Complete cut and removal of existing asphalt roadway 

    Excavation down under soils from 16 inches to 18 inches 
    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures
    Rebar placement and engineered grid patterns to limit erosion 
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi with controlled highway rake finish
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $35,000 per pad
    Project duration: 2 weeks

  • Farmers Insurance - Fitness Center

    1,970 square foot fitness facility
    A men’s and woman’s locker room complete with showers and restrooms.
    Brand new HVAC system with stainless steel ductwork and make up air
    Key card auto lock doors, electronic card pass system and security upgrades.
    Full functioning gym complete with durable rubber athletic interlock floor
    Project Cost: $279,000
    Project duration: 8 weeks

    Farmers Insurance - Fitness Center

    1,970 square foot fitness facility
    A men’s and woman’s locker room complete with showers and restrooms.
    Brand new HVAC system with stainless steel ductwork and make up air
    Key card auto lock doors, electronic card pass system and security upgrades.
    Full functioning gym complete with durable rubber athletic interlock floor
    Project Cost: $279,000
    Project duration: 8 weeks
    010203040506070809101112131415

  • Oregon Department of Transportation (ODOT) Bus Pad - OR 99E & Concord Rd

    1000 square foot bus pad on OR 99 E Highway
    Complete cut and removal of existing asphalt roadway 

    Excavation down under soils from 16 inches to 18 inches 
    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures
    Rebar placement and engineered grid patterns to limit erosion 
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi with controlled highway rake finish
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $35,000 per pad
    Project duration: 2 weeks

    Oregon Department of Transportation (ODOT) Bus Pad - OR 99E & Concord Rd

    1000 square foot bus pad on OR 99 E Highway
    Complete cut and removal of existing asphalt roadway 

    Excavation down under soils from 16 inches to 18 inches 
    Crushed bed rock compacted, and tested
    Maintained ODOT highway traffic control measures
    Rebar placement and engineered grid patterns to limit erosion 
    Engineered dowel baskets and integrated saw cut control joints
    Rapid set concrete at 5000 psi with controlled highway rake finish
    Concrete sealed for erosion control measurements
    Loop sealed control joints
    Project Cost: $35,000 per pad
    Project duration: 2 weeks

  • ADP Generator Pad

    600 square foot monolithic generator pad and brick enclosure
    New Three phase, 500 KW, 60Hz, Standby Diesel Engine Generator
    Sight surveys, saw cut and excavation

    Re-grading, gravel compaction and sight tests
    Formed cast monolithic curbs and concrete flatwork for generator
    Sight excavation for new electrical transformer and interior electrical panels
    Structural brick up to ten feet, wall caps
    New sidewalks, curbs and parking space
    1500 gallon fuel tanks, special inspections and Clackamas fire inspections and Building inspections
    New landscaping, sprinkler system and trees
    Concrete sealed for erosion control measurements
    Round the clock job site security measures, light traffic control

    Project Cost: $180,000
    Project duration: 13 weeks

    ADP Generator Pad

    600 square foot monolithic generator pad and brick enclosure
    New Three phase, 500 KW, 60Hz, Standby Diesel Engine Generator
    Sight surveys, saw cut and excavation

    Re-grading, gravel compaction and sight tests
    Formed cast monolithic curbs and concrete flatwork for generator
    Sight excavation for new electrical transformer and interior electrical panels
    Structural brick up to ten feet, wall caps
    New sidewalks, curbs and parking space
    1500 gallon fuel tanks, special inspections and Clackamas fire inspections and Building inspections
    New landscaping, sprinkler system and trees
    Concrete sealed for erosion control measurements
    Round the clock job site security measures, light traffic control

    Project Cost: $180,000
    Project duration: 13 weeks

  • Zurich

    4,280 square foot complete tenant improvement to new location
    Complete grid replacement, fire sprinkler system, HVAC and electrical panels
    New fire sprinkler system
    New integrated HVAC system tied into existing building
    New electrical service panels
    Full height glass office walls and flush floor conference phone systems
    Project Cost: $313,000

    Project duration: 8 weeks

    Zurich

    4,280 square foot complete tenant improvement to new location
    Complete grid replacement, fire sprinkler system, HVAC and electrical panels
    New fire sprinkler system
    New integrated HVAC system tied into existing building
    New electrical service panels
    Full height glass office walls and flush floor conference phone systems
    Project Cost: $313,000

    Project duration: 8 weeks
    010203040506070809101112131415161718192021222324

  • Tomera - Accelerated TriMet Tenet Relocation

    20,000 square foot office/warehouse rehabilitation project
    Accelerated Tri-Met construction schedule with tight deadlines and pin point inspection reports
    New interior walls, restrooms and warehouse floor sealing
    PGE approved transformer placement, New Castle pre-engineered concrete pad, and City mandated truck bollards
    New 400 watt service panels
    Interior finishes including new cabinets, carpet, tile, vinyl and paint
    Wooden exterior stairs to an upper mezzanine
    State of the art 2X2 LED light fixtures throughout mezzanine
    Newly insulated mezzanine and exterior stucco upgrades
    New landscaping, sprinkler systems and parking planter boxes
    City mandated bicycle lockers
    Project Cost: $285,000
    Project duration: 14 weeks

    Tomera - Accelerated TriMet Tenet Relocation

    20,000 square foot office/warehouse rehabilitation project
    Accelerated Tri-Met construction schedule with tight deadlines and pin point inspection reports
    New interior walls, restrooms and warehouse floor sealing
    PGE approved transformer placement, New Castle pre-engineered concrete pad, and City mandated truck bollards
    New 400 watt service panels
    Interior finishes including new cabinets, carpet, tile, vinyl and paint
    Wooden exterior stairs to an upper mezzanine
    State of the art 2X2 LED light fixtures throughout mezzanine
    Newly insulated mezzanine and exterior stucco upgrades
    New landscaping, sprinkler systems and parking planter boxes
    City mandated bicycle lockers
    Project Cost: $285,000
    Project duration: 14 weeks
    010203040506

  • Snap Fitness

    3,950 square foot tenant improvement
    Complete demolition including slab cut, grid removal and walls

    Complete pressure wash and seal coated existing brick work to as new condition
    Restored the classic building features to blend in with the Sellwood surround.
    New interior finishes, custom rubber exercise floor lock system, tile restrooms
    Complete Thermoplastic polyolefin (TPO) single-ply roofing membrane
    Full height walls for sound deadening requirements
    New HVAC system complete
    Newly exposed ceiling with state of the art LED lighting throughout.
    New parking lot striping and sealing
    ADA improvements including new restrooms, sidewalks and ramps.
    Project Cost: $350,000
    Project duration: 10 weeks

    Snap Fitness

    3,950 square foot tenant improvement
    Complete demolition including slab cut, grid removal and walls

    Complete pressure wash and seal coated existing brick work to as new condition
    Restored the classic building features to blend in with the Sellwood surround.
    New interior finishes, custom rubber exercise floor lock system, tile restrooms
    Complete Thermoplastic polyolefin (TPO) single-ply roofing membrane
    Full height walls for sound deadening requirements
    New HVAC system complete
    Newly exposed ceiling with state of the art LED lighting throughout.
    New parking lot striping and sealing
    ADA improvements including new restrooms, sidewalks and ramps.
    Project Cost: $350,000
    Project duration: 10 weeks

  • Cricket Wireless

    1,000 square feet complete turnkey tenant improvement
    New patricians
    New wallpaper in accordance to Cricket Wireless Corporate requirements
    New carpet and paint
    HVAC
    Electrical
    Plumbing
    Exterior signage
    Fire sprinkler alterations
    Project consists of a vanilla shell tenant improvement in under a 28 day schedule!

    Cricket Wireless

    1,000 square feet complete turnkey tenant improvement
    New patricians
    New wallpaper in accordance to Cricket Wireless Corporate requirements
    New carpet and paint
    HVAC
    Electrical
    Plumbing
    Exterior signage
    Fire sprinkler alterations
    Project consists of a vanilla shell tenant improvement in under a 28 day schedule!

  • Jamba Juice

    2,200 square feet  
    Removal of a pony wall
    Rerouting electrical and data for new cash register counter
    Installation of new display case, sneeze guard, seasoning shelf
    Interior lighting
    VCT flooring workroom
    Entryway tile
    Cabinets
    Paint including wall murals

    Jamba Juice

    2,200 square feet  
    Removal of a pony wall
    Rerouting electrical and data for new cash register counter
    Installation of new display case, sneeze guard, seasoning shelf
    Interior lighting
    VCT flooring workroom
    Entryway tile
    Cabinets
    Paint including wall murals

  • Medallion

    25,000 square feet of combined office/showroom warehouse
    Premier Italian ceramic flooring
    Acoustical second look ceilings
    New Bathrooms
    Craftsman style architectural molding and trim work
    Artistically stained concrete
    Updated mechanical, electrical and plumbing
    Windows
    Demolition of original cedar

    Medallion

    25,000 square feet of combined office/showroom warehouse
    Premier Italian ceramic flooring
    Acoustical second look ceilings
    New Bathrooms
    Craftsman style architectural molding and trim work
    Artistically stained concrete
    Updated mechanical, electrical and plumbing
    Windows
    Demolition of original cedar